Versions Compared
Key
- This line was added.
- This line was removed.
- Formatting was changed.
On some orders a mixed pallet is required to be built and the products mixed on the pallet are required for reporting. JASCI allows the operator to build mixed pallets through the below steps:
Step 1: Pick Product
The operator selects ‘Order Pick’ on the handheld device and scans/enters the ‘Door’
If the ‘Door’ scanned/entered does not have any open orders, the operator is returned to scan/enter a valid ‘door’
The operator scans/enters the work zone and the LPN they will be picking onto. JASCI will display the pick locatoin
If the work zone is not valid, the system returns the user to scan/enter a valid work zone
If the LPN is not valid, the system returns the user to scan/enter a valid LPN
The operator scans the location and JASCI displays the product to pick
If the location is not correct, the system returns the user to scan/enter the correct location
If the required product is in the location, operator will scan the product and JASCI will display the quantity to pick
If the product is not correct, the system returns the user to scan/enter the correct product
If the required product is not in the location, the operator can select ‘Cut’ and JASCI will mark the order as ‘Trouble’
If the product is in stock in another location, JASCI will redirect the operator to the next location with available inventory (not sure if this is in phase I of the flows)
If the inventory in the location is more than or equal to the required quantity for the pickThe operator will confirm the pick quantity and place the product on the pallet
If the inventory in the location is less than the required quantity for the pick, the operator will enter the actual quantity picked and place the picked quantity of the pallet.