Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current Restore this Version View Page History

« Previous Version 2 Next »

On some orders a mixed pallet is required to be built and the products mixed on the pallet are required for reporting. JASCI allows the operator to build mixed pallets through the below steps:

Step 1: Pick Product

  • The operator selects ‘Order Pick’ on the handheld device